My maple desk and right hand side cabinet. Left side cabinet being
installed on 7-4-2002. Now for the "bridge"cabinet above the
window.
I did not take many photos of the desk and right side cabinet while
under construction (film type camera).
I am took digital photos of the left side cabinet.